MT Barker South 275/66kV Substation

The project required the complete design of the new 275/66kV substation, this included civil, structural earthworks and electrical design. The secondary works included all protection SCADA configuration (Logica RTUís) and on site testing.

The project involved:

1 x 275/66kV 225MVA Transformer;

2 x 275kV Line;

2 x 275kV busbar;

2 x 275kV Diameters;