MT Barker South 275/66kV Substation
The project required the complete design of the new 275/66kV substation, this included civil, structural earthworks and electrical design. The secondary works included all protection SCADA configuration (Logica RTU’s) and on site testing.
The project involved:
1 x 275/66kV 225MVA Transformer;
2 x 275kV Line;
2 x 275kV busbar;
2 x 275kV Diameters;