MT Barker South 275/66kV Substation

The project required the complete design of the new 275/66kV substation, this included civil, structural earthworks and electrical design. The secondary works included all protection SCADA configuration (Logica RTU�s) and on site testing.

 

The project involved:

  • 1 x 275/66kV 225MVA Transformer;
  • 2 x 275kV Line;
  • 2 x 275kV busbar;
  • 2 x 275kV Diameters;